Checking the rotation direction of the impeller .The impeller should rotate in the counter clockwise, or the electro motor’s wiring should be adjusted.
The start sequence of the breaker and convey equipment. Discharge →breaker→feed Breaker muse be started up under no loading condition, the materials should be fed after the breaker is in good order.
The sequence of shut down and start up is opposite.
The feed size should be according to the requirement of every kind of machine strictly, materials over the requirements must be forbidden otherwise imbalance is produced and the impeller is wired heavily, even the tunnel of impeller and middle of feed tube will be jammed, as a result the machine can’t work well. Feeding should be continuous and even, The huge shake and abnormal noise shouldn’t exist in the process of the operation, or the machine should be shut down and checked.
The style of lubrication is dry-oil lubrication; the mobile automobile-used lubricating grease and 3 # spodumene grease should lubricate the machine, proper grease should be added to the breaker per 100 hours.